Put a basketball pole in a 24" X 24" hole with 960 pounds of Quick Crete 9 days ago, and the pole still moves quite a lot, is not stable at all. Should the concrete not be cured by now? Temps have been warm and ground is not wet, the ground is mostly clay in that area. Any suggestions?
Thanks!
how long for 24" x 24" hole of concrete to cure around basketball pole?
Thanks!
0 commentaires:
Enregistrer un commentaire