I plan to run water to an outbuilding I constructed which has raised a few questions. I'm using 3/4" or 1/2" PEX and the distance is approximately 40' to the building. The building will have a full bath (with water heater) and an extra sink in the shop area. So...should I run 1/2" PEX to the building or 3/4"? (does it matter?). And perhaps most importantly, how best would I attach to the source? The supply line coming into my house is 3/4" copper pipe. After the pressure regulator, it is 1/2" copper throughout the house. I wondered if I should simply "T" off from a 1/2" cold water line somewhere and just run it directly to the bulding. Or should I install a 3/4" 'T' on the incoming line (before the pressure regulator) and install a SECOND pressure regulator there, just for the outbuilding? Wasn't sure if it was OK to have two pressure regulators. Lots of questions here; any help would be greatly appreciated!
Where to tie in for auxiliary water line?
Affichage des articles dont le libellé est Where to tie in for auxiliary water line?. Afficher tous les articles
Affichage des articles dont le libellé est Where to tie in for auxiliary water line?. Afficher tous les articles
Inscription à :
Articles (Atom)