lundi 18 mai 2015

Securing NM running through joists in unfinished garage

I'm putting in a sub-panel and running 6/3 NM through the joists to the panel location on the opposite side of the garage. The garage/basement is ground level and unfinished.

I'm curious to know if there is a limit the the length of the run? It looks like it will be approx 50' perpendicular to the joist, then will run 5-ish feet on both ends along each joist.

Additionally, other than staples on the parallel joist runs, is there a way I should be securing the NM when it's going through the joists? Or does the parallel run with staples on each end do the job?

Thanks.
Securing NM running through joists in unfinished garage

0 commentaires:

Enregistrer un commentaire

Popular Posts

Categories

Unordered List

Text Widget

Blog Archive

Followers

Fourni par Blogger.